Thursday, November 19, 2026 06:54 AM

Toll rates fixed as Nagdhunga Tunnel nearing December opening

Kathmandu, Aug 15: The government has approved toll fees for the soon-to-open Nagdhunga–Sisne Khola Tunnel Road. Spokesperson and ICT Minister Prithvi Subba Gurung said the Cabinet endorsed rates set by the Department of Roads.

Cars and vans will pay Rs 65 to enter Kathmandu and Rs 60 to exit. Mini-buses and small trucks will pay Rs 115 inbound and Rs 80 outbound, large buses and heavy trucks Rs 260 and Rs 200, and vehicles carrying heavy equipment Rs 600 and Rs 250. Motorcycles and vehicles carrying flammable fuels will be barred from using the tunnel.

The 2.6 km tunnel, built by Japan’s Hazama–Ando JV, is over 92 percent complete and is expected to open by December. Construction began in 2019 and is financed through a Rs 16 billion JICA loan plus Rs 9 billion from the Nepali government. It will cut the Balambu–Sisne Khola route from 7.5 km to 5 km, halving travel time and easing traffic at Thankot and Nagdhunga. Trial runs are underway, with most structural works, including underpasses, overpasses, and three entry bridges, already finished.

Safety features include a rescue tunnel 30 meters away from the main tunnel, linked by seven gates, with telephone booths, CCTV, and mobile service. A control room will monitor incidents, and ambulances and fire engines will be stationed at both ends. Fifteen jet fans will maintain air quality inside the enclosed space.

Once operational, the tunnel will streamline travel in and out of Kathmandu, reduce congestion, and improve safety for daily commuters and freight vehicles.

People’s News Monitoring Service

Conversation

Login to add a comment