Monday, September 14, 2026 02:46 AM

Construction of13 Postal Highway sections completed

Kathmandu, 1 April:  Ambassador of India to Nepal  Vinay Mohan Kwatra and Minister for Physical Infrastructure and Transport Basant Kumar Nembang  have jointly dedicated 13 out of the 14 road  packages  under the Postal Highway to the people of Nepal.

The roads which have been completed and are already being used by the people of the areas
since over a year, have been handed over to the government of Nepal.  These newly completed roads have been providing smooth travel experience to people of the Terai region.

The Government of India funded ten Terai roads in Nepal are built as per the specifications
prescribed by the Department of Roads of Nepal. Each road has a seven meter carriage way and two
meters of shoulders on both sides. The roads also include drainage, foot paths with railings in
habitation areas, road signage boards, road markings and other road furniture. Under the project over
652 culverts and over 111 kilometers of drainage network have also been built.

People’s News Monitoring Service

Conversation

Login to add a comment